Buried Water Tank
Construction steps for buried water tank:
1. Clean and demarcate the construction area to remove debris and obstacles, ensuring a smooth construction site. According to the construction drawings, delineate the construction area and set up clear signs.
2. Excavation and reinforcement construction shall be carried out in accordance with the requirements of the construction
drawings, paying attention to protecting the surrounding environment and facilities. After excavation is completed,
reinforcement construction is carried out to ensure that the reinforcement meets the design requirements and increases
the strength and stability of the water tank.

3. After the reinforcement construction is completed, pour the concrete foundation. Before pouring, inspect the foundation to ensure that its quality meets the design requirements. During the pouring process, pay attention to the
uniformity and compactness of the concrete. After pouring, carry out curing to ensure that the concrete reaches the
design strength.
4. After the water tank foundation reaches the design strength, the water tank is assembled and assembled. During the
assembly process, follow the design drawings to ensure that the size and shape of the water tank meet the requirements.
Pay attention to the sealing and stability of the water tank to prevent leakage or deformation.

5.After the assembly of the sealed and perforated water tank is completed, proceed with the sealing and perforation work. Suitable sealing materials and methods are used for connection sealing to ensure good sealing performance of the water tank. The opening position is accurate and the size meets the design requirements.
6. Install the pump room and equipment near the water tank according to the design requirements. During the installation process, pay attention to the level and verticality of the equipment to ensure its normal operation. Debug and
test the equipment to ensure good performance.